Tel/Fax: +218 217106699

Hazardous Plant Decommissioning

A Tetra Ethyl Lead (Ethylation) plant in Azzawyia refinery was successfully decommissioned, decontaminated and disposed off.
The operations included the cold cut of all plant piping, the transportation of the plant to a safe area and the removal of all sludge content and storage in certified containers.

The operation included the cut of the plant in small sections and the final decontamination by flaring all surfaces of the plant.
The project included also the continuous air monitoring and the monitoring of the ground and soil below the decontaminated plant.

All personnel was wearing specific PPE.